The dash aim may be the determination with the sprint backlog and does not modify over the sprint (when the “scope of labor” may possibly basically change). As being the plan changes (through the sprint or through every day scrum) those variations are mirrored over the dash backlog. transformation of https://business69923.blogminds.com/business-no-further-a-mystery-24780273