Standard costing method is a two-phase system. In the first phase, organization incurred many of the overhead prices into the production department after which in the 2nd phase overhead Price tag was assigned on The premise of generation operate-labor Price. The labor operate price of $one was resulting in overhead https://kylerpkhbc.bloguetechno.com/an-unbiased-view-of-case-study-providers-70053950